Visioo documentation
Learn in-depth how Visioo works in real construction operations.
Featured articles
Browse by category
Visioo Fleet
Visioo fleet details
visioo-fleet-details
Why this matters
Visioo builds on the assets you already operate rather than a blank system. Setting up in the right order means your first cost report reflects real activity instead of estimates.
Before you start
- Admin access to your Visioo workspace
- A list of the vehicles and machines used on site
- Who works on which project
Setup order
- Add vehicles and machines
- Add employees
- Add fuel tanks (optional)
- Set up your workspace and cost structure
Most teams finish this in under an hour. You can add assets later without redoing anything.
Visioo Tracking
Setting up geofences
Define zones and get alerted on entry or exit.
setting-up-geofences
Why this matters
A geofence tells Visioo where a project physically starts and ends, so activity is attributed to the right site automatically instead of being assigned by hand.
Before you start
- The project must already exist
- Know the approximate site boundary
Steps
- Go to Tracking → Geofences → New
- Draw the boundary on the map
- Link it to a project
- Turn on entry and exit alerts if you want notifications
Add a 20–30 m buffer beyond the actual boundary. Tight fences cause repeated entry/exit alerts as machines work near the edge.
Visioo Fleet
How project costs are calculated
The formula behind cost tracking and variance.
how-project-costs-are-calculated
Why this matters
Knowing the formula makes variance explainable instead of surprising.
The formula
Project cost = machine hours × hourly rate + labour hours × labour rate + fuel consumed × fuel price + fixed costs
Where each number comes from
- Machine hours — telematics, or manual entry if not connected
- Labour hours — kiosk check-ins or time declarations
- Fuel — tank refuel logs
- Fixed costs — your workspace cost structure
Variance compares actual against planned. Anything past 10% is usually worth investigating.
Visioo Operations
Visioo Operations details
visioo-operations-details
Why this matters
Operations is where day-to-day field activity becomes structured data. Tracking and Fleet tell you where machines are and what they cost — Operations tells you what actually happened on site, and against which project.
What Operations covers
- Projects — the unit everything else attributes to
- Time — who worked, where, for how long
- Activity — what was done, logged from the field rather than reconstructed later
- Cost structure — the rates that turn hours into money
Before you start
- At least one project created
- Employees added, with hourly rates set
How data arrives
Most activity is logged from the Visioo Kiosk App on site. Where a project has geofences, entry and exit are recorded automatically and no one has to declare anything.
Operations runs on its own once projects and people exist. If reports look thin, it's almost always because activity isn't being logged at source — not because something is misconfigured.
Getting started
How to add fuel tanks (optional)
how-to-add-fuel-tanks-optional
Why this matters
Fuel is usually the largest variable cost after labour. Tracking tanks lets Visioo attribute fuel to a specific machine and project instead of a monthly lump sum.
Steps
- Go to Fuel → Add tank
- Enter the name, capacity and location
- Record deliveries as they arrive
- Log each refuel against the machine that received it
Without tanks, fuel still appears as a project cost — just not per machine.
Getting started
Getting started with Visioo
Overview of the setup flow: assets, people, data sources, and cost structure.
getting-started-with-visioo
Why this matters
Visioo builds on the assets you already operate rather than a blank system. Setting up in the right order means your first cost report reflects real activity instead of estimates.
Before you start
- Admin access to your Visioo workspace
- A list of the vehicles and machines used on site
- Who works on which project
Setup order
- Add vehicles and machines
- Add employees
- Add fuel tanks (optional)
- Set up your workspace and cost structure
Most teams finish this in under an hour. You can add assets later without redoing anything.
Getting started
How to add vehicles and machines
Register the vehicles and machines you already operate in the field.
how-to-add-vehicles-and-machines
Why this matters
Every cost Visioo calculates traces back to an asset. Until a machine exists in the system, its hours and fuel can't be attributed to a project.
Before you start
- Admin access
- Registration or ID numbers for each machine
Steps
- Go to Assets → Add asset
- Enter the name, registration and type
- Set the hourly cost rate
- Assign it to a project (optional — you can do this later)
Hourly rates can be changed at any time, but historical costs are not recalculated.